Roderick U. Lyles Raleigh, NC. (614) 330-0012 rodericklyles@hotmail.com OBJECTIVE: Seeking
a challenging position in a related field where my academic training and
personal experience will be utilized. This position must offer opportunities
for professional escalation. EDUCATION: 1992-1993
Devry Institute of Technology 2000-2002
Columbus State G.P.A. 3.20/4.0 ·
Obtained A.A.S. March
2002 Computer Electronic Engineering EMPLOYMENT: 9/13-10/13
CWS/Velocitel (AT&T) LTE Site Audits (South Dakota)
Construction Manager · Responsible for
site scheduling of crews · Responsible for
training crews to do the following: · Take photos and
measurements of shelter inside for verification · Take up close
photos of all equipment name, model number, and serial number · Take photos and
measurements of compound and all items on compound for verification · Take measurements
of all equipment and their position in FIF racks · Correctly identify,
name, and list all equipment on FIF racks · Take measurements
of all equipment and their position in Telco rack · Correctly identify,
name, and list all equipment in Telco rack · Locate T1 as well
as Fiber Demarcation · Identify and record
all sectors coming in thru the hatchplate · Draw sketches of
coax coming into and out of diplexer · Draw sketches of
the shelter equipment with measurements of each site · Draw sketches of
compound layout with measurements · All information
recorded was entered into an 18 tab excel spreadsheet for each site · I was responsible
for all closeout packages and site rejections 4/13-6/13
Glotel (AT&T) Harvest Project (North Carolina, Georgia, Virginia)
Senior Technician ·
Site walks done to get
configuration, wide band combiner, and radio count ·
If MCPA is powered and
RF is hooked up I de-commissioned the power and RF, reconfigured the GSM,
maximized the power in BSC, and left MCPA on site ·
Lock BTS from BSC ·
Bypass MCPA and cable
GSM straight to hardlines ·
Perform sweep on any
new jumpers added if necessary ·
Power down MCPA’s after
bypass ·
Pull all related dc
breakers and power cabling ·
Disconnect MCPA alarm
cables ·
Disable/ de-activate
MCPA alarm from BSC ·
Leave MCPA on site ·
Mine all RF cables
& DC cable connected to MCPA ·
Perform test calls and
hand-off calls ·
Take pre and post
photos 08/12-03/13 T-Mobile
US Modernization (Cleveland, Columbus, Chicago,
Atlanta)
Field Supervisor
·
C&I Flexi
Certified/PTID available ·
Commissioned and
integrated Flexi FSME/ESMB system modules ·
Made DB9 alarm
connection to 7705 ·
Made sure tower crew
swept the LMU antenna lines using the anritsu ·
Run T1’s from FCOA
cabinet to Telco side 66 block ·
Punched down alarms on
Telco 66 block ·
Mounted and cabled up
alarm box ·
Program alarms in
SSC/BBU cabinet using ARMS_B3.06B06 software ·
Site surveys ·
responsible
for logistics, material coordination, commissioning, ·
turn-up
Data, RF and Optic equipment ·
scheduling
and staffing the installation of DC power systems ·
19 racks,
network and fiber cabling, and 7705 routers ·
Photos and
close outs turned in upon site completion ·
l possess
the technical and troubleshooting capabilities necessary to integrate Data,
RF and Optic equipment into the network ·
proficient
in GSM, UMTS and LTE technologies 06/12-8/12
ESP/WNG Pittsburgh, PA. (AT&T) ·
Installed Ericsson LTE
750MHz and UMTS 850&1900MHz radios ·
Commissioned and
Integrated Ericsson LTE 750MHz ·
Installed PDU’s
and Cisco routers ·
Ran power to power bay ·
Ran ‘SAU’ alarm cables
to the 66 block ·
Terminated alarm cable
to RAYCAP and OVP ·
Installed LTE 6601 and
SAU’s ·
Integrated and did call
test for RBS 6601 ·
Verified RAYCAP alarm
connected and enabled ·
Recorded and sent in
VSWR reading ·
Verified all 3 sectors
have no contact alarms 08/11-10/11
SkyTechnical/Nsoro Tennessee(AT&T)
Site Supervisor ·
Performed site audit
work ·
Trained new techs on
equipment ·
6601/MU installs ·
Ran fiber from SIAD to
MU ·
Ran 3 SFP's to MU 01/11-7/11
Orin USA Ohio (AT&T)
Senior Technician ·
Ran and Installed 25
pair from equipment to common side ·
Mounted NEMA and
Hoffman boxes to H-frames ·
ALU SIAD installs ·
Ran DC cables to power
source and powered up SIAD ·
Ran T1 from Node B to
SIAD ·
Ran fiber optics from
Ciena 311/3911 to SIAD ·
Updated SIAD flashcard
with up to date software ·
Loaded scripts using
ACAT and pinged ·
Troubleshooting of
Ciena 3911, C311, 6601 and SIAD if ping unsuccessful ·
Trained new techs on
identifying equipment, properly running/installing of fiber optics and power
cable ·
Provided reports and
photos of work daily 02/10-6/10
Glotel
Bawa(AT&T)
Senior Technician ·
Installed
indoor/outdoor T1 expansion kits in Lucent Node B ·
Installed and ran
conduit from D-mark to Hoffman Box ·
Wire wrapped spans 1-4 ·
Installed and grounded
surge arrestors for spans 5-12 ·
Extended and
punched down T-1 at 66 block ·
Extended and punched
down T-1 from extension cable to surge arrestor ·
Used
T-Berd 2310 to test circuits ·
Performed
series of test with POC to verify circuits were good ·
T1 test performed;
quassi, 0’sand 1’s, ·
T1 expands done
for Fiber tower, Cox, and Verizon ·
Ran DS3
cable from Node B to SIAD unit ·
Installed and powered
up SIAD; R2A, R2C, LTE, and Ethernet combinations ·
Ran
24v/48v power from Tyco powerplant or Noran Tel PDU to SIAD ·
Documented
SIAD Asset Tag number ·
Removed dummy cards and
installed UCUIII cards into proper slots Lucent Node B cabinets ·
Completed Nokia BTS
build and commissioning ·
Cabinets
worked with; AT&T Ericcson and Nokia indoor/outdoor, Lucent Node B,
Purcell, Innovation, ProAir, Microwave, ·
Provided photos and
daily field report of all work done 04/09-06/09
SkyTechnical Tennessee (AT&T) Senior
Technician ·
Verified building
layout, coordinates with GPS, site access ·
Verified AC-DC service
breakers, power plant and capacity ·
Verified BBU sizing and
capacity ·
Verified all Telco
lines, DSX panel size and capacity and NIU ·
Verified all antenna
jumpers, Coax size and connection type ·
Verified alarm punch
down block per AT&T scope ·
Verified GSM 850/1900
components and equipment frames, FIF rack layouts ·
Took photos to verify
all work 11/08-1/09
MBI Bay Area (AT&T)
Tower Lead ·
Perform 2nd carrier install and integration ·
Install High Speed TX
and Rx boards ·
Install RU and FU for
second carrier add ·
Load add sector scripts
along with psu add script ·
Modify scripts for node
when needed 07/05-11/08
Celcite/CTAC (AT&T)
Senior Technician ·
Activated phones/ SIMS
using POS, OPUS,Telegence, Care ·
End to end 3G/UMTS
testing ·
Tested switch/network
integrity ·
Performed CALEA testing ·
2G/3G Handover Drive
testing ·
Tested new cellular
equipment software and msg tags ·
Verified and placed
calls on TDMA/GSM/UMTS networks 05/05-07/05
EXI Parsons Ohio/Florida (AT&T)
Field Tech ·
Installed,
commissioned, and inventory of RBS 2106/2206 and 2102 cabinet types ·
Ran fiber optics/power
cables and laced all cables ·
Replaced APG 40 with
IOG 40 ·
Swapped out
STRU’s and DXU 11 on V-3/V-4 sites ·
Took sites down and
back up to swap out plates in V-3 cabinets ·
Called switch to verify
no alarms present
03/05-05/05
Ejaad(Celcite) Northern California
Site Auditor ·
Collected and stored
data from the equipment into Excel ·
Responsible for tracing
wiring/cables in equipment ·
Audited switch MSC/BBS
facilities ·
Audited Ericsson 202
and 810 cabinets for client to upload backbone network ·
Provided daily progress
reports of all work 04/02-03/05
Darwin Partners Massachusetts/Ohio Lead
Technician ·
Installed,
commissioned, and testing of True Position E911 LMU’s ·
Installed, color coded
and ran RF cabling and coax ·
Installed/connected T1
cables from LMU to Axxiux comm. Unit ·
Project in Nortel
8000/1200 and all Ericsson cabinets ·
Mounted GPS/GSM
downlink antenna and surge protectors ·
Turned in pictures/site
surveys daily ·
Provided maintenance
and cleanup RELATED TECHNICAL SKILLS: ·
Nokia Siemens Network
commissioning and Integration certified ·
HP 8935, Spectrum
analyzer, T-berd, Anritsu s251B/332B ·
Trimble asset surveyor,
Digital Radio Communications Tester, Digital multimeter ·
Garmin handheld GPS ·
A+ certified, completed
training in CCNA, Multiple MCP’s ·
Certified in Nokia BTS
and Ericsson BTS, BSC ·
Basic installation for
BSC/BTS ·
Advanced working
knowledge of OMT/AutoCad ·
Completed UMTS/3G and
True Positions field technician training |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|